CASE STUDY REGENERATIVE THERMAL OXIDIZER (RTO) WITH DUST COLLECTOR FOR A PRE-FILTER Client: DuPont’s EVA Copolymer plant Location: Beijing, China Background: Air Clear LLC worked in conjunction with
CAPITAL & OPERATING COST REDUCTION USING A CATALYTIC OXIDIZER! East Coast Coated Fabrics Manufacturer faced conflicting objectives of meeting environmental compliance vs. capital and operating cost reduction. So it is
Client: POSCO Engineering & Construction Co. Ltd (Pocos Steel) Location: Pohang, S. Korea Process: Color Coating Line Background: Pocos Steel has (3) three high-volume color coating lines which emit